Iklin - Romar & No 49 Iklin, Triq il-Klin, Iklin
Demolition of existing terraced house, and including demolition of already approved cafeteria plus tuition centre (as per PA4751/18). Excavation and construction of basement, construction of office (Class 4A) at ground floor, construction of cafeteria (Class 4C) at ground floor (replacing that in PA4751/18); construction of tuition centre (Class 2C) at first floor (replacing that in PA4751/18); and construction of 6 residential units from second floor upwards.
Category: Demolition & New Construction (Mixed Use)
Applicant: Albert Sant
Architect: MASStudio