PA/01566/22

Zebbug - Washrooms 1 and 3, Belle De Jour, 43, Triq Hal Mula, Zebbug

Proposed alterations to structures at the existing third-floor level. Alterations include extensions at the rear and front of the washroom structures, the adjoining of the two structures through the introduction of an internal doorway, and the opening of new windows.

Category: Alterations & Extensions (Other)

Applicant: Mr Anton Zammit

Architect: Perit Daniel Attard

View on PropertyList.mt