PA/02780/24

Marsascala - Land at along Zonqor Coast, Stormwater Outfall, Zonqor, Marsascala

Excavation and construction of a silt pit for the temporary deposition of liquid silt during the cleaning operations of Zabbar stormwater tunnel. Works entail the lowering of the existing access ramp and existing gate to the tunnel.

Category: New Construction (Other)

Applicant: Stephen Bonello obo Public Works Department

Architect: Perit Mario Ellul

View on PropertyList.mt