PA/03266/25

Mosta - 140, Triq Ponsonby, Mosta

To demolish washroom at second floor level, construct two additional floors, carry out minor alterations at existing level -1 / level 0 / level 1 and to install a passenger lift which is to provide access from level -1 up to the proposed recessed floor level. Proposed jacuzzi at roof level.

Category: Demolition & New Construction (Other)

Applicant: Roberto Vella

Architect: M&V Architects

View on PropertyList.mt