Iklin - 40, Tincliffe, Triq Stefano Erardi, Iklin
To demolish the existing terraced house, to excavate a basement level and a reservoir underneath the basement. To propose the construction of a reservoir, a basement level, an elevated ground floor office, three levels of apartments from the first floor to the third floor level, and a penthouse on the fourth-floor level.
Category: Demolition & New Construction (Mixed Use)
Applicant: Navi Developments Attn: Ivan Bezzina
Architect: Perit Silvienne Camilleri