Zabbar - Vacant Site, Triq il-Papa Piju Xii c/w, Triq ic-Cimiterju, Zabbar
Proposed clearing of site, excavation of two floors and construction of aquamation centre and cemeterial facilities. Consisting of basement parking at lower level, aquamation facilities, burial chambers and columbarium at upper basement level, and lift room, ceremonial hall and reception building and garden with columbarium and tombstones at ground floor level.
Category: New Construction (Other)
Applicant: Dr Jeremy Muscat
Architect: Perit Maria Schembri Grima