Qormi - 126, Ir-Rummiena, Triq San Gorg, Qormi
Proposed internal alterations consisting in the addition of dividing walls and changes to staircase and apertures. Addition of screening to a shaft with overlooking windows at roof level and raising of parapet wall to reach a safe height. Moreover to include the proposed sanctioning of the staircase at ground floor level
Category: Sanctioning (Alterations/Extensions)
Applicant: Mr Alessio Cassar
Architect: Perit Adrian Davison