Zabbar - Settembrina, 7, Triq il-Grazzji, Zabbar
To sanction changes from approved PA300/99. Changes consist of the extension of the washroom and construction of a domestic store at roof level, internal alterations such as division of a bedroom into two bedrooms, introduction of two skylights and installation of a chimney and PV panels on roof, and minor changes to parapet wall on facade and cladding of dado. Proposal includes correction of site from PA300/99.
Category: Sanctioning (Alterations/Extensions)
Applicant: Ms Nadia Carabott
Architect: Perit Robert Borg Hayman