Zabbar - 155, Triq Lia, Zabbar
Proposed demolition of existing terraced house and construction of a garage at basement level, maisonette at ground floor level, 3 apartments at first, second, and third floor level, and penthouse at fourth-floor level.
Category: Demolition & New Construction (Residential)
Applicant: Mr Antoine Micallef
Architect: Perit Ludovico Micallef