Zebbug - 26, Triq il-Princep Baziliku, Zebbug
Variations from the official building alignment for the existing footprint, and sanctioning of existing ground floor garage which was approved as maisonette in PB/5153/79 (i.e., sanctioning also of the change of use of same). Proposed excavation (mainly removal of fill) to form basement domestic store, and reconstruction of garage floor at higher level, including other minor changes.
Category: Sanctioning (Residential Unit/Alterations)
Applicant: Doreen Didi Saliba
Architect: MASStudio