Zabbar - Frott ta' l-Art, Trejqet il-Mithna, Zabbar
Internal alterations at ground floor and first floor to create two separate units, demolition of washroom at third floor level, construction of apartment at third floor, and construction of a penthouse at receded floor level. Alterations are proposed into existing facade and stairs from ground to first floor to approved PA 150/95 including the construction of stairs at second, third and receded floor level as well as the construction of a lift shaft from ground floor to receded floor level.
Category: Demolition & New Construction (Residential)
Applicant: Mr Saviour Schembri
Architect: Perit Karl Cutajar